The contract covers; Construction of Serik 2 Waste Water Treatment Plant with a capacity of 65.000 m³/day, along with provision and installation of Electro-Mechanical Equipment SCADA and automation Systems. Construction of 3 reinforced concrete elevation centers (Voyage, Belek Main elevation, Belek-2 elevation), 1 packet elevation center (Jacaranda), in total 4 elevations centers, including electro mechanical equipment installation. Installation of 1.480 mt f 315 , 5.257 mt f 400 , 8.140 mt f 800, 9.752 mt f 1000 PN10 HDPE force main pipes.